BRICTEC Shaoxing Lvzhan Project
Xi’an Brictec designed this Lvzhan project in 2023. The project has annual output of 300,000㎡ of sintered bricks and prefabricated brick wall by using local solid waste such as chemical contaminated soil, construction residue, printing and dyeing sludge as the main raw materials, etc. so as to make high quality sintered bricks making, and 60%-70% of electricity needed for production line is from the photovoltaic power generation on the factory roof. Xi’an Brictec provides whole package service from the preliminary planning and design of the project to the supply of core equipment in the later stage. Single layer tunnel dryer process is adopted with natural gas burning system for tunnel kiln (7 meters inner width). Xi’an Brictec has delivered a very satisfactory EPC project to our client, and also set a new benchmark for the solid waste recycle and utilization in the industry.